Friday, November 10, 2017

Trail Access Finally Comes to Glorieta

Long talked about and now finally in motion, the Glorieta Camps trails (formerly the Baptist Conference Center) will soon be available to public access via a newly constructed trail routing around the Campus to the southeast.

Working in tandem with Glorieta Camps, Santa Fe County, and IMBA, the Santa Fe Fat Tire Society has the lead on this project and is asking for trail work volunteers as well as contributions to fund the work, setting a goal of $2,500 (nearly half funded as of Nov 10). - Contribute Here -

Continuing work on the access trail is scheduled for this Sun Nov 12, 9am SHARP at the Glorieta Camps main gate.
..."We'll be working on building more of the Glorieta Access trail. We got over 1/2 of the initial section built 2 weeks ago and will be working on the rest. We'll work until around noon, have some lunch, and then ride the great trails at GC. Another sunny day, with a high forecast for mid-50's. SFFTS will provide all the tools needed for the trail work."





A map of the Glorieta system via Strava heatmap. Glorieta Camps at the center there with various trails branching out and up. The orange route tracing a north-south boundary to the east is the road up to the fire lookout and to access the descents.



UPDATE: The funding for this trail project came through in a big way: $3,045 in total which exceeds the goal amount by +25% and was the top funded project of the 68 proposed projects of this year's IMBA Dig In campaign. Very well done to the good folks at SFFTSociety.


Related Posts:
 - Drink Beer: Support Local Trails
 - Santa Fe Watershed Assoc's new Arroyo Project
 - Local Outdoor Charitable Organizations Need Your Support


Wednesday, January 4, 2017

Improvements to the Santa Fe River Trail - Jan 2017

The work looking west
Construction on the city's pedestrian underpass along the Acequia Trail has paused for the winter months (resuming in April). However, new improvements have begun on widening the portion of the Santa Fe River Trail along Alameda (east of St. Francis Dr) from sidewalk width (5ft) to pedestrian/bikeway specifications of approximately 10-12ft.

The improvements convert the existing sidewalk into a city trail that allows room for people and bikes passing in opposing directions. This section of the River Trail along Alameda will soon resemble an extension of the newer sections of trail west of St Francis Dr. that wind down past Alto Park and through to Frenchy's Field.

I'm uncertain if plans are to widen and improve all the walkway east to the DeFouri St Bridge? which has itself been scheduled for improvement for years now. One person I spoke with made mention that the trail alignment could cross the river via one of the footbridges and continue east on the south bank. We should see in a few months time.

Update: A recent article on this trail work ran in the SFNMexican this week - just four days after this post was published. One of our City Councilors (Lindell, Dist 1) was publicly complaining about tearing out a working sidewalk and replacing it with something new. Dan Chacon wrote the article, and included loads of detail on why the Councilor was misinformed on the source of funding (not city funds, but voter approved bond funds specifically for improvement of trail infrastructure. The dollars involved include matching federal funds that came in at near 1-to-1), as well as why the improvements were included in the city's approved Transportation and Bicycling Master Plan years ago. He also noted that Lindell literally voted to approve the work. Dan does great work and his attention to detail is admirable.

The new trail/bikeway looking east toward the mountains. 

Lone bicyclist shows the scale of old pathway

Related Posts:
 - Acequia Underpass Groundbreaking (Aug '16)
 - Santa Fe Trail Projects Update (Sep '16)
 - Trail Improvements Page


Sunday, September 25, 2016

Santa Fe Trail-Building Projects Lurch Forward

Drilling equipment setting the bracing for the new underpass
Work on the Acequia Trail Underpass began in earnest this weekend. Equipment has been hauled to the site and orange barrels are in place for the start of weekday traffic. This is a major piece of our new urban trail/pedestrian/cycling infrastructure which will surely incite cries of commuter agony for the next six months followed by decades of value, appreciation, and laudatory expressions of foresight and vision from future generations of Santa Feans.

This project and other have been held up all year due to City budget deliberations despite segregated allocation of funds between park and trail bond receipts and the city's general fund. Don't get me going on this topic, point being the new work is rolling now since a lot of the scheduled projects have completed the required planning and public input stages, committee approval, bidding, etc.


Santa Fe Conservation Trust volunteers at work on the new footbridge
at Camino de las Animas
Smaller less visible projects that have been completed in the meantime include a new extension of the Acequia Trail at Harrison Rd and La Cieneguita St;  A new footbridge over the ditch at Camino de las Animas (useful connector east onto Agua Fria and Canyon Rds; old bridge was all peligroso); Engineering and trail work on the unofficial north/south footpath in the Santa Fe Canyon Preserve; and the new work on the far east end of the River Trail - replacing and installing sidewalk along Alameda up to Patrick Smith Park.

The new footpath extension at Santa Fe Canyon Preserve.
Not yet officially completed or opened to public use.
There has also been several additions of bike lanes on city and county roads including Old Santa Fe Trail south of St. John's College through to El Gancho Way; New lanes on Siringo Dr. from St Francis Dr. to Llano St.

Major projects and additions anticipated for 2017 include the Pen Rd section of the Rail Trail (thru to Alta Vista), and the 15mi El Camino Real Trail along Buckman Rd from the Rio Grande to Caja del Rio Rd west of town. This second project is being managed by BLM and the National Park Service thankfully, removed from dependence on the City and it's various governing committees.


















New bike lane off Old Las
Vegas Highway
The Harrison Rd connector
near Rufina; Acequia Trail
Related Posts:
 - Acequia Trail Underpass Groundbreaking/Announcement (Aug '16)
 - Acequia Trail Underpass GreenLit (Aug '15)
 - Arroyo Chamisos Underpass (2012)



Monday, August 15, 2016

Acequia Trail Underpass GroundBreaking

After many months of delays the groundbreaking for the new bike and pedestrian tunnel linking the Railyard to the west Acequia Trail is set for this Wednesday, Aug 17th (Turns out it was a groundbreaking in name only - instead it was a formal announcement of groundbreaking planned for mid-September!). Construction is expected to take 6 months from beginning to end though some of this will be prep and landscape work rather than road closures.

Approximately 85% of the funding for this project source from a Federal Non-Motorized Transportation grant, the remainder from 2012 City Parks and Trails bonds. This won't keep un-informed and uninterested folks all over town from complaining about prioritizing spending. The project also spent many many years in planning, committees, and public meetings but this won't keep the same people from belly-aching about design or the need for an overpass or unrelated hang-ups, etcetera, etc., ad infinitum. Bottom line is that all of this new and sorely needed infrastructure is going to change the town for the better, tying together adjacent neighborhoods, increasing land values and incentivizing private investment, and increasing foot traffic for local businesses.

Acequia Trail Tunnel - Schematic drawings
A related project that will likely arrive on the heels of the new underpass is the re-work of the Rail Trail segment along Pen Rd and the Rail Runner Station between Cordova and Alta Vista. Trees will be added as will improved road crossings and safety medians. Planning is complete and funding has been allocated from previous bond sales. This whole area will be spruced up and looking fine.

Groundbreaking Celebration: Wednesday Aug 17th, 4pm

Related Posts:
 - Delays in Pending Trail Projects (2016)
 - Acequia Trail Underpass Scheduled for this Fall (2015)
 - Arroyo Chamisos Underpass Nears Completion (2012)

Tuesday, February 16, 2016

Delays in Pending Santa Fe Trail Projects

Several Santa Fe city trail projects that appeared to have been slated for work prior to year-end 2015 have yet to move forward. There's sadness and disappointment each time I'm running errands on the bike scanning for the expected orange barrels and flags. These things are complex but with planning complete and funding in-hand the recent delays are difficult to explain. Pending projects include the Acequia Trail Underpass, the Pen Road connector, Dale Ball connector at the SF Canyon Preserve, various signage, etc.

My working theory on the stalled work is that the city's current financial problems are creating a freeze, and this affects the planned projects even though funds for trail construction source from bond money rather than city operating funds and shouldn't be affected by the coming budget cuts. The full reason is likely some combination of staffing uncertainty and a defensive political posture from the Council who would ultimately approve the ground-breaking on these projects.

A review of the Jan. minutes from the Bicycles and Trails Advisory Committee (BTAC) shows little if any discussion on the anticipated projects and no indication of construction planning. The next BTAC meeting is tomorrow evening (Wed 2/17), 530pm at City Hall. Should you ever have the itch to show up and discuss a trail topic know that public comments are welcome and are generally the third item on the evening's agenda after roll-call and approval of minutes.


Related Posts:
 - Acequia Trail Underpass Scheduled this Fall (Sep 2015)
 - Trail Improvement Page
 - Arroyo Chamiso Underpass Nears Completion (Jun 2012)
 - Santa Fe Rail Trail Improvements (Sep 2015)


Monday, September 7, 2015

Santa Fe Rail Trail Improvements - Updated

Kid is my co-pilot
The Rail Trail’s transformation from footpath to transportation infrastructure appears to be moving along. Phases two and three of the recent engineering improvements, a five mile section from the Spur Trail to Nine Mile Rd then on to Avenida Vista Grande in Eldorado, are just now nearing the end of nine months of work. The most notable addition is the new trailhead at Nine-Mile Rd including a built-out underpass of the tracks. Many of the previously straight sections along the trail now curl and meander through trees. I'm a fan.

The trail has been undergoing re-alignment, re-surfacing, and erosion protection over the last several years, all part of a long-term effort of the NM Dept of Transportation who manages the railroad easements in partnership with Santa Fe County and SFCounty Open Space who manage the trail. The first improvement phase from Rabbit Rd to the Spur Trail (~1.5mi) was completed in 2013. Parking and trailhead reconstruction went in the year before that. There's another three phases of trail work planned out to the junction with Highway 285. Phase four would complete improvements through Eldorado. The last two miles of the rail into Lamy are privately owned and no trail exists there. Funding for this long term trail work sources from county gross receipt taxes and federal highway administration grants.


The new alignment at Nine-Mile Rd, passes under the trestle
From Nine-Mile down to the trestle
New erosion armoring

Sunflowers and meanders
Realignment and clouds

Related Posts:


View Santa Fe Rail Trail - Santa Fe, NM in a larger map


Wednesday, September 2, 2015

Acequia Trail Underpass Scheduled this Fall

Artist's rendering of the new underpass. Much larger than the Zia Rd crossing.
The final public meeting for the Acequia Trail Underpass was held last night. Groundbreaking for the project is expected in as soon as 6-8 weeks. Construction of the entire project is expected to take approx. 9 months, with a focus on completing the tunnel and disrupting traffic on St. Francis much quicker than this. Unlike many Santa Fe developments, this is a project that directly benefits those that live here. It bears remembering that the construction of St Francis Drive back in the 60's divided neighborhoods and projects of this sort begin to bind them together once again.

The meeting was an open house that drew the regular crew of cyclists, urban planners, and grumpy neighbors to discuss the project with the designer and city park and trails managers. Part of the project design was completed by local landscape architect Solange Serquis whom entertained my many questions. I was especially fond of her use of trees and rock work to lighten up what has always been a sad and dusty intersection. Unusually, several city councilors were in attendance (Bushee, Lindell, possibly Rivera) though I didn't get a minute to chat. Wasn't certain if they were there to be seen as part of such a large non-motorized infrastructure project or perhaps to get a feel for the public mood of such an undertaking.

Cross section view of traffic overhead, the underpass, and east/west entrances
This major piece of the city's urban trail network has been in planning for at least seven years if not longer. Dozens of public meetings led to this point. Big discussions three years back focused on whether the transportation link should be an overpass or underpass, with many elected officials advocating for a more visible, possibly iconic overpass at the city's busiest intersection. The majority of trail users backed the practicality and ease of use of an underpass (a no-brainer in my opinion). The two valid criticisms of the project at this time were user safety (minimized with several lighting and design elements), and the price tag. Cost estimates were large enough that the underpass was designated a non-priority project in the city's transportation plan with maybe an 8-12 year time horizon. This was until a $3.8m federal grant came through last fall and suddenly the largest and most visible non-motorized transportation project in the city's plans was green-lit. The incoming federal dollars equate to $7 in matching funds for each $1 of invested city funding for this project. Or when compared with the $15m in city voter approved trail bonds since 2008, this sum equals a direct return on public trails infrastructure investment of 25%. This is a straight up coup, and whomever wrote up that grant application deserves free drinks and several million hi-fives.

The overview drawings. Railyard Park at right. 
Well then, exciting times and lots to think about. Will the project be complete for next year's May Bike-and-Brew event? Unlikely I suppose. Will complaints from the pending construction traffic be loud and bellicose? Undoubtedly, but this would surely be the case for any road construction anywhere in town for any reason. In return for a few months of traffic cones the planned improvements will be of use for generations of Santa Feans. Will this project lead to more private investment and revitalization in nearby neighborhoods and/or along the nearby St. Francis and Cerrillos corridors? I'd assume yes. How soon until an underpass is feasible along the Santa Fe River Trail at Alameda? I'd guess it's a ways out unless another generous federal grant were to come along to grease the skids.

Update: Trail project delays run into Spring of '16

Related Posts:
 - Acequia Trail Underpass Funding (2014)
 - Arroyo Chamiso Underpass (2012)
 - Area Trail Improvements Page
 - Improvements to the Santa Fe Urban Trail System (2012)



View Acequia Trail - Santa Fe, NM in a larger map


Wednesday, October 1, 2014

Acequia Trail Underpass - Queued Up

Last week's Santa Fe Reporter was the bike issue. Terrific read. Everything bikes and trails and bike shops. Lotta great stuff including a piece about the west section of the Railyard and its old derelict caboose, (a personal favorite of mine). Embedded in the article was mention of $3.8 million in Federal transportation funding that very recently became available for construction of the often discussed Acequia Trail Underpass connecting the Railyard to the Baca Street District.

This was the first I'd seen or heard of this new money. After a quick search I found a Julie Ann Grimm piece, also in the Reporter, confirming the new funding. It means that ground breaking on the new underpass/trail connector is a go, possibly in the spring or summer of next year. Planning and designs for the project have long been in place and the public comment process was completed this spring (underpass preferred to overpass). The remaining hold-up was funding, or rather, a priority mis-match in spending this great sum for the benefit of a critical yet relatively low-demand section of the trail network. The city will need to come up with $500,000 to cover remaining project costs, and this funding happens to be immediately available due to a June City Council decision to defer construction on the Alameda Underpass (Santa Fe River Trail) and instead re-allocate the $1.9 million in bond funds for that project across several smaller projects.

Coincidentally, one recipient project of the re-allocated funding will be the western-most terminus of the Acequia Trail, the connector that will feed into the Santa Fe River Trail from South Meadows Rd to ~San Felipe Rd and Agua Fria. This portion of the River Trail is an orphan section built-out last year with available federal funds targeted for The Camino Real de Tierra Adentro. This western end of the River Trail falls within the National Parks Service alignment of the historic Camino Real, and the federal dollars became available before the County could work on the surrounding parts of the trail network. An additional recipient project of the new funding will be the planned spur from the Camino Real section to the soccer fields at the Municipal Rec Complex along Caja del Rio Rd. The tunnel under NM 599 is already there, built along with the road. I've been through it but it's literally choked under several feet of tumble weeds. I imagine this new money will be used to clear out the weeds and chamisas along the trail itself, and add a few signs so you know where the hell you're at and where you're going.

Conceptual designs of the new underpass - from above and at path level.

Related Posts:



View Acequia Trail - Santa Fe, NM in a larger map


Wednesday, July 30, 2014

Santa Fe Multi-Use Trails Update

Santa Fe Rail Trail at the Railyard Plaza
As published in yesterday’s Santa Fe New Mexican, the City Public Works Committee voted to recommend to the City Council that the proposed bike/pedestrian underpass at Alameda and St Francis be shelved in favor of re-allocating the roughly $2 million in bond funds for an assortment of other improvements to the trails system.

All of these various additions are queued up in the current Santa Fe Metro Bicycle Master Plan (yes, some of us do actually read these things). As an avid trail user, old and new, this shift in spending priorities looks to be a very favorable exchange. The following are the projects under current discussion to be funded by the new allocations - UPDATED, with Sept 23 projects officially approved by City Council:
1) $300,000 $100,000 for at grade improvements at Alameda/St Francis (in place of the underpass)
2) Canada Rincon multi-use Trail. connecting the neighborhoods near Zocalo to Calle Mejia (better access to Gonzales Community School) .32miles/ $132,000 $200,000
3) Arroyo En Medio Trail. connecting Gail Ryba Trail at Zia Rd. to Sawmill Rd. .25miles/ $200,000 (access for Capshaw Middle School, Little Earth School and SF Girls' School)
3) Municipal Rec Complex Trail, connector from the Santa Fe River Trail to the
culvert underpass at NM 599. Will ultimately extend to MRC, $150,000
4) Arroyo Mascaras Trail. connecting the Mascaras to west San Francisco St. / $150,000
5) Tierra Contenta Trail (n. Arroyo Chamiso Trl). connecting Buffalo Grass to South Meadows. .38miles/ $300,000 (safe routes to school access for Sweeney, Ortiz and others)
6) Acequia Trail at Otowi Drive .10miles/ $80,000
7) Acequia Trail at S. Meadows/Rufina to SF River Trail(end of Agua Fria) 1.0mile $660,000 $113,800
8) Infrastructure improvements: City way-finding, $30,000 and Safety infrastructure (focusing on dangerous railroad crossings), $10,000
9) Acequia Trail Underpass (with $3.8 million sourced from the Federal Dept of Transportation), $556,200 local matching funds
10) Bike lanes and road widening on Old Santa Fe Trail, from E. Zia to Sun Mtn Rd (in conjunction with new lanes and road widening on the County portion of Old Santa Fe Trail up to El Gancho Way), $200,000
A thank you goes out to Stephen Newhall for relaying these project details. Thanks Stephen!

Update: Take two minutes of your time to fire off an email to your City Councilors (two for each district) and cc: Councilor Bushee (who chairs the city Bicycle and Trails Advisory Committee [BTAC]). Let them know you're a trail user, that you vote, and what your stance is on the city's trails network. My email referenced the above along with an emphasis on - MORE TRLS PLZ. 

Related Posts:



View Acequia Trail - Santa Fe, NM in a larger map

Monday, June 2, 2014

Trail Work - Arroyo Chamiso Trail

Arroyo Chamiso at Camino Carlos Rey (May 6, 2014)
Took the little one out for a run recently, cruising the Arroyo Chamiso trail since it's flat and right out the back door. In a stroke of irony, the paved trail I never run on because there's a perfectly runnable arroyo 30ft to the south, suddenly became unpaved. It seems the oldest trail in Santa Fe's urban trail system (1994) was scheduled for repair and re-paving.

I've noticed several other ongoing projects including erosion control at Arroyo Chamiso and Gail Ryba (at the underpass), erosion control on the Rail Trail at the county line (I-25 underpass), and the improvements at the La Tierra underpass to Ortiz Park.

I know a new bike lane is scheduled to be added to Old Santa Fe Trail soon (El Gancho Way to Zia Rd), and the missing stretch of the Arroyo Chamiso at Cerrillos Rd will be added soon along with the new business and residential developments going in there. There's also ongoing planning and design work on a proposed new alignment for the Arroyo Hondo Trail south of town (NM 14 to Richards Rd) which will eventually close a loop with Arroyo Chamiso and the Rail Trail. Good stuff.
Brand new trail - Arroyo Chamiso (May 25)
Related Posts:
 - Arroyo Chamisos Bike Trail Underpass (2012)
 - Trail Improvements on Winsor and Galisteo Basin (2013)
 - Santa Fe Rail Trail Re-Imagined


View Arroyo Chamiso Trail - Santa Fe, NM in a larger map


Saturday, January 18, 2014

January Cycling

Moon and the Santa Fe River Valley at Frenchy's
On the bike this morning for a ride on Super Loop. It was pretty eff-ing cold - needed the sunglasses just to keep my eyes from icing shut. It's January, yes, but had sold myself on this week being warm. Not how it works on a bike. The water in my bottle turned to slush in an unfunny attempt of further ridicule.

If the snow won't fall at least it means the trails are clear for riding.

Curiously, didn't see too many folks out. First on at La Tierra and had the trails to myself. My old friend the moon sat above the blue horizon of the Jemez and would say hello each time I veered to the west.

19mi, 934ft, 1hr45min






The improved NM 599 bike underpass to La Tierra
NM 599 on the right
Overkill with a buncha' needless bridges
La Tierra
Moon and the Jemez from the east La Tierra Ridge
Related Posts:
 - La Tierra - Trail 34
 - Moonlit Ride in the North Hills



View Super Loop Trail - Santa Fe, NM in a larger map


Friday, November 1, 2013

Trail Improvements on Winsor and Galisteo Basin

There was a slowdown in visible trail construction around town this year but that's not to mean that our trails were just lying unloved. The Santa Fe Fat Tire Society and the Santa Fe Trails Alliance continue to add to our existing recreation trail network with trail-work days, volunteer training, and now bridge construction. At least two new bridges went up on the Winsor Trail this Fall (at Borrego and lower Winsor), and one existing bridge saw improvements. If you've volunteered with the SF Trails Alliance you'll recognize some of the tools in the video below. If you participated in last October's IMBA World Summit you'll recognize the red shirts.

There's at least one more month of riding (and running) left before snow settles in on the higher sections of the mountains, so there's time to get one last ride in on Winsor and check out the new work.



BorregoBridge
from Santa Fe Fat Tire Society (Brent Bonwell) on Vimeo


Prepping the bridge work
New crossing on lower Winsor - completed
Sawing logs on upper Winsor. USFS certification is required to cut and remove
deadfall in the National Forest. These two have that. 

Kicking man-sized logs to the trail side like a boss(es)

Sheehan fending off an early winter, taking trail work to the next level

Recent Fall improvements included:
  - Needed work on the La Piedra Trail switchbacks to bring them back into shape
  - New 1mi-2mi section of trail in the Galisteo Basin Preserve
  - Clean up and improvements at La Tierra after Septembers flooding and erosion



Wednesday, June 26, 2013

The Santa Fe Rail Trail Re-Imagined

The Pistol - out rippin' miles like a boss
In light of the recent trail and forest closures due to excessive fire danger (our second closure in three years), I thought I'd write about the Rail Trail which will remain open during the closures and for that reason is likely to see a bit more foot and cycling traffic over the next couple months. Because the southern section of the trail is relatively flat and has only one road crossing (Rabbit Rd) it's ideal for long marathon training runs (20+) and for non-technical mountain bike rides if you or someone in your riding group lacks the skillset to negotiate Dale Ball or La Tierra.

The Rail Trail is a genuine classic, holding title as the oldest of our in-town trails. It predates the Arroyo Chamisos Trail (footpaths before the trail was put in), by several years if not longer. As such, it stood as the template for the many trails that have come afterward including Arroyo Chamisos (1997), Dale Ball (2001), and eventually the Santa Fe River and Acequia Trails. The Winsor, Borrego, and Atalaya trails are much older, but they traverse the foothills and high county and share a pastoral history that generally belongs in an all together different class of trail systems.

Thirty years ago the Rail Trail was primarily an ad-hoc route that followed along the Santa Fe Rail Line from Arroyo Hondo and Sunlit Hills up to the city limits. Eldorado was just being built out then and Lamy was a as sparsely populated as it is now. An adventurous friend I knew in high school would occasionally bike in along the rail line all the way from Glorieta, (he also happened to be a state champion runner). But things changed for the better in 1994 when Stewart Udall and the newly formed Santa Fe Conservation Trust stepped in and secured the land in trust, and with some federal funding that they cobbled together they were able to build out a few re-routes and development of actual sections of trail separate from the railbed cobbles and rail-ties.

New trail improvements include a planed surface and significant erosion control - Fall 2012

Rock work and an newly elevated section near the tracks - Fall 2012
Looking north at the newly elevated path. It's completed now.
Note the snow in the highcountry when the photo was taken. 
Cadillac pedestrian crossing out in BFE
The Rail Trail has been improved on a couple times since, most notably the formal development of the trail from the city/county line out on Rabbit Rd through town and into the new Railyard Plaza in 2008. Formal trailheads were also put in at Nine Mile Rd, Rabbit Rd, and Zia & St. Francis at that time. Last summer (2012) saw the completion of stage 1 of a new alignment and re-grade of the trail, bringing the trail up to code by setting it a minimum distance from the tracks, building in fence lines and signage, and adding features for better drainage and maintenance of the trail. The work involved the two miles of trail between Rabbit Rd and the Spur Trail. I don't recall the sequence in which work is scheduled on the other sections but I believe the Eldorado portion attracts the second most traffic along the trail and so they are next in line.

New signage
Old signage. True story - I probably ran out a couple hundred miles on the Rail Trail
before someone pointed these mile markers out to me.  Just never noticed them I guess. 
I love the what they've done to the trail. It's just gorgeous now with most if not all of the sand sections and widowmaker potholes removed (not fun to be surprised by one of these at night). The new rock work and berms provide texture and capture the proper aesthetic. My favorite times to be on the trail are daybreak, sunset, and at full moon. Unmatched views. The major new complaint from rec users that I hear often is that in an effort to make the trail more accessible all technical elements have been sanitized and removed. Bollocks, I say! If you get out and explore a little a bit you'll find that there's miles of untouched singletrack on the east side of the tracks. Great for running, less great for riding in my opinion because in my experience sand and blind potholes lead to unnecessary separation from the bike followed by pain and discomfort. If your aim is technical riding why mark the Rail Trail anyway when Dale Ball sits beckoning only a few miles to the east? The two offer very different trail experiences. One is a national class recreation trail, Dale Ball; the other is a stellar off-road commuter route amenable to jogging strollers, the Rail Trail. Decades in the making no less.

Now get out there and make it happen. Explore your trails.

Miles 6, 7, and 8 - on any given summer evening on the Rail Trail. 
Related Posts:
  - Rail Trail Improvements Update (Sep 2015)
  - Train Trestle Loop
  - Cycling the Rail Trail - Zia Rd to Nine Mile Rd'
  - Luminaries on the Rail Trail



View Santa Fe Rail Trail - Santa Fe, NM in a larger map


Thursday, June 21, 2012

Arroyo Chamisos Bike Trail Underpass Nears Completion

Under construction since last August, the long awaited St. Francis Dr. bike trail underpass is just about finished. The new underpass connects the Arroyo Chamisos Trail to the city's eastside and the newly built stretch of city trail that routes to the hospital - the Gail Ryba Trail. I pass this way just about everyday and have been snapping semi-regular photos of the progress. So here they are, lined up in sequence.

Time lapse - construction of an underpass:

Arroyo chamisos trail underpass
The Arroyo Chamisos Underpass


First half complete, second half dug out





Steelworker guys photo-bombing my shot at 7am




The art relief panels - Foam molds are set in place before the concrete pour for the wall.






As of Wed. 6/20, almost there. I think they're waiting for the official opening/dedication before removing the fencing. The graffiti taggers are as anxious to use the tunnel as the bicyclists and runners.

My one complaint with the tunnel work had been the lack of obvious drainage. No drains, no grates, nothing. The tunnel will fill with water (or ice) at the first rain or snow! It will be unusable several months of the year! Aaah, but just yesterday I recognized the solution. The entire tunnel is built as drainage - the floor of the tunnel itself drops at a barely perceptible slope allowing water collecting on the east trail surfaces to flow through and out at the west entrance. That there is some mastery in engineering. Bravo sirs, bravo.

Besides bypassing the mess of traffic on St. Francis, the impetus for the trail was to add a transportation connection from the Rail Runner train stop at Zia and St. Francis to the hospital, the city's largest employer apparently. The new underpass is the first of its kind in Santa Fe. A culvert passing under Rodeo Rd was retro-fitted two years ago to extend the Arroyo Chamisos Trail west toward Cerrillos. A similar culvert retro-fit is planned for the Santa Fe River Trail at St. Francis and Alameda, and another culvert underpass exists out in Santa Fe County at NM 599 and Caja del Rio Rd, providing access to the soccer fields out that way.

I should note that Albuquerque's spectacular new pedestrian and bike bridge spanning the Rio Grande along Interstate-40 is also named in honor of Gail Ryba. Gail was almost single-handedly responsible for setting up New Mexico municipal bikeways and the relevant government committees and budgeting processes in Albuquerque and Santa Fe. A not-so-small debt of gratitude due to Ms. Ryba.

Gail Ryba Bridge
Gail Ryba Bike & Pedestrian Bridge - Albuquerque, NM, 2010
Related Links
 - Santa Fe Area Trails and Maps



View Gail Ryba Trail - Santa Fe, NM in a larger map



LinkWithin

Related Posts Plugin for WordPress, Blogger...