Showing posts with label Arroyo Chamiso. Show all posts
Showing posts with label Arroyo Chamiso. Show all posts

Friday, October 17, 2014

Arroyo Washout

Two foot+ drop in the arroyo floor at the St Francis Dr. crossing
My weekend run was along the Arroyo Chamiso. I'd seen in passing that the arroyo channel was destroyed near the house and I wanted to tour the rest of the carnage. Storms like the one that produced this flood happen every couple years but they're always a source of awe and excitement.

Massive scouring and drops in some areas; other areas collecting the tons of displaced sand resulting in rises of several feet. Debris in trees at levels above shoulder-height. Amazing stuff.

On the return trip I stumbled on two young graffiti artists in the culvert of the Old Pecos Trail crossing. They called me sir. I critiqued their work and ran on. Good kids.


Storm debris at the bridge along Gail Ryba suggests the flood level was above the bridge deck

Heavy debris (entire chamisa bushes) wrapped on railroad pylons up to 6ft in height

Helpful sign along Gail Ryba:  Don't enter the arroyo when flooding
An up-arroyo property armored with willow and cottonwood plantings. Erosion minimal.
A recent Dia de los Muertos themed piece near the museums


Related Posts:
 - RAIN! - NM River Levels Spike 30x Avg Flows (2013)
 - Come Hell or High Water - Monsoon Season (2013)
 - Floods Ravage Bandelier and Cochiti Canyons (2011)
 - Santa Fe's Arroyo Systems

Saturday, August 23, 2014

Atalaya Mountain in August

Atalaya Mountain - the 'watchtower' in archaic Spanish
MTB on Atalaya this morning. Clouds and a supervillain fog-bank up on the summit ridge were my prize. It's a fine morning when you can sip an IPA at breakfast and know you're good for it.

This morning's climb followed the blue route.A lot of obvious work on the trail from this month's maintenance crews. Bless those folks. Lots of volunteer trail days on the fall calendar.


View Atalaya Mountain Trail - Santa Fe, NM in a larger map

Related Posts:
 - Early Morning on Atalaya
 - Picacho Peak - Climbing the Ladder
 - Moon Mountain Trail

Wednesday, July 30, 2014

Santa Fe Multi-Use Trails Update

Santa Fe Rail Trail at the Railyard Plaza
As published in yesterday’s Santa Fe New Mexican, the City Public Works Committee voted to recommend to the City Council that the proposed bike/pedestrian underpass at Alameda and St Francis be shelved in favor of re-allocating the roughly $2 million in bond funds for an assortment of other improvements to the trails system.

All of these various additions are queued up in the current Santa Fe Metro Bicycle Master Plan (yes, some of us do actually read these things). As an avid trail user, old and new, this shift in spending priorities looks to be a very favorable exchange. The following are the projects under current discussion to be funded by the new allocations - UPDATED, with Sept 23 projects officially approved by City Council:
1) $300,000 $100,000 for at grade improvements at Alameda/St Francis (in place of the underpass)
2) Canada Rincon multi-use Trail. connecting the neighborhoods near Zocalo to Calle Mejia (better access to Gonzales Community School) .32miles/ $132,000 $200,000
3) Arroyo En Medio Trail. connecting Gail Ryba Trail at Zia Rd. to Sawmill Rd. .25miles/ $200,000 (access for Capshaw Middle School, Little Earth School and SF Girls' School)
3) Municipal Rec Complex Trail, connector from the Santa Fe River Trail to the
culvert underpass at NM 599. Will ultimately extend to MRC, $150,000
4) Arroyo Mascaras Trail. connecting the Mascaras to west San Francisco St. / $150,000
5) Tierra Contenta Trail (n. Arroyo Chamiso Trl). connecting Buffalo Grass to South Meadows. .38miles/ $300,000 (safe routes to school access for Sweeney, Ortiz and others)
6) Acequia Trail at Otowi Drive .10miles/ $80,000
7) Acequia Trail at S. Meadows/Rufina to SF River Trail(end of Agua Fria) 1.0mile $660,000 $113,800
8) Infrastructure improvements: City way-finding, $30,000 and Safety infrastructure (focusing on dangerous railroad crossings), $10,000
9) Acequia Trail Underpass (with $3.8 million sourced from the Federal Dept of Transportation), $556,200 local matching funds
10) Bike lanes and road widening on Old Santa Fe Trail, from E. Zia to Sun Mtn Rd (in conjunction with new lanes and road widening on the County portion of Old Santa Fe Trail up to El Gancho Way), $200,000
A thank you goes out to Stephen Newhall for relaying these project details. Thanks Stephen!

Update: Take two minutes of your time to fire off an email to your City Councilors (two for each district) and cc: Councilor Bushee (who chairs the city Bicycle and Trails Advisory Committee [BTAC]). Let them know you're a trail user, that you vote, and what your stance is on the city's trails network. My email referenced the above along with an emphasis on - MORE TRLS PLZ. 

Related Posts:



View Acequia Trail - Santa Fe, NM in a larger map

Monday, June 2, 2014

Trail Work - Arroyo Chamiso Trail

Arroyo Chamiso at Camino Carlos Rey (May 6, 2014)
Took the little one out for a run recently, cruising the Arroyo Chamiso trail since it's flat and right out the back door. In a stroke of irony, the paved trail I never run on because there's a perfectly runnable arroyo 30ft to the south, suddenly became unpaved. It seems the oldest trail in Santa Fe's urban trail system (1994) was scheduled for repair and re-paving.

I've noticed several other ongoing projects including erosion control at Arroyo Chamiso and Gail Ryba (at the underpass), erosion control on the Rail Trail at the county line (I-25 underpass), and the improvements at the La Tierra underpass to Ortiz Park.

I know a new bike lane is scheduled to be added to Old Santa Fe Trail soon (El Gancho Way to Zia Rd), and the missing stretch of the Arroyo Chamiso at Cerrillos Rd will be added soon along with the new business and residential developments going in there. There's also ongoing planning and design work on a proposed new alignment for the Arroyo Hondo Trail south of town (NM 14 to Richards Rd) which will eventually close a loop with Arroyo Chamiso and the Rail Trail. Good stuff.
Brand new trail - Arroyo Chamiso (May 25)
Related Posts:
 - Arroyo Chamisos Bike Trail Underpass (2012)
 - Trail Improvements on Winsor and Galisteo Basin (2013)
 - Santa Fe Rail Trail Re-Imagined


View Arroyo Chamiso Trail - Santa Fe, NM in a larger map


Wednesday, March 28, 2012

Improvements to the Santa Fe Urban Trails System


The start (or ending point) of the Santa Fe Rail Trail at the Railyard Plaza
Santa Fe voters recently approved a second parks-and-trails bond measure to fund continued improvements to the city's growing urban trails system.

The system includes three main east-west alignments - the Santa Fe River Trail, the Acequia Trail, and the Arroyo Chamiso Trail - and the north-south alignment of the Santa Fe Rail Trail which intersects the other three.

The three east-west corridors will remain in progress for several years with planned extensions all the way out to NM 599 with connections north to the city soccer field complex in the Caja del Rio, and south to NM 14.

Trail descriptions and maps of these trail corridors are as follows:
      - Arroyo Chamisos Trail
      - Santa Fe Rail Trail
      - Santa Fe River Trail
      - The Acequia Trail, and

The new system is in addition to the area's hiking and biking recreation trails which include the Dale Ball Trails, the Winsor Trail System, La Tierra Trails, Arroyo Hondo, and the Galisteo Basin.

A total of $6 million from the most recent bond sale will be allocated for priority urban trail projects over the next few years. This new capital follows an initial $9 million in funding approved by voters in 2008, both specifically allocated to city trails and road-sharing projects.
arroyo chamisos trail sign
Arroyo Chamisos Trail

Funds were used to acquire the necessary easements and build out trail extensions for the Santa Fe River Trail and the new Acequia Trail west of St Francis Dr, as well as extend the Arroyo Chamisos Trail west to the Santa Fe Place Mall (via a new underpass at Rodeo Rd), and now east with access to the Gail Ryba Trail and Christus St. Vincent Hospital (via an underpass at St Francis Dr). The 2008 investment was nicely complemented by state and federal funding for the Santa Fe Rail Trail in conjunction with the construction of the New Mexico Rail Runner Commuter Train.

santa fe rail trail
Santa Fe County Rail Trail
The end result of this flurry of planning and investment is a new framework of paved multi-use trails within city limits. Beginning with the first few miles of the Arroyo Chamisos Trail in 1997, the system now includes four main trails anchored by the 17mi Rail Trail which connects them all. Really, really good stuff.

The Santa Fe Metropolitan Planning Organization (SFMPO) has mapped out priority lists for planned trail extensions, improvements, and bike-share corridors which include shoulder widening along some streets and lane striping. Of the new $6 million in funding, priority trail work will include the following:

  1. $2M for a planned underpass of the Santa Fe River Trail at Alameda and St Francis Drive. This is a key link along the River Trail that's really going to tie together the stretch of new trail to the west of St Francis (extending to Frenchy's Field at Osage and Agua Fria), to the older section that passes through downtown up as far as Delgado St. Updated Here: 
santa fe acequia trail
The Santa Fe Acequia Trail
  1. Completion of sections of the Rail Trail between St Francis Dr. and Alta Vista, along Pen Rd. and along the South Capitol Rail Runner Station.
  1. Extensions and improvements to the Acequia Trail which now stretches behind the New Mexico School for the Deaf (west of the Santa Fe Railyard) to Baca Rd and a trailhead island at Ashbaugh Park that currently goes nowhere. Planned improvements will extend the trail through Ashbaugh Park and Osage Ave. to Harrison Rd near the county boundary.
  1. Extension of the Gail Ryba Trail along St Francis Dr (which will soon be connected to the Rail Trail and Arroyo Chamisos Trail via underpass), east to Botulph Rd and East Zia Rd.
  1. Construction of another mile extension to the W. Arroyo Chamiso trail section as it slowly edges its way toward Cerrillos Rd and an eventual linkup with the larger E. Arroyo Chamisos Trail section.
    santa fe rail trail
    The Santa Fe Rail Trail
  1. Construction of a new multi-use trail along the Arroyo en Medio/Arroyo Chapparal in south Santa Fe, connecting Ragle Park to the New Mexico Rail Runner station at Zia Rd, as-well-as to the intersection of the Rail Trail, Arroyo Chamisos Trail, and Gail Ryba Trails. I don't know whether to be happy or sad about this one since the dirt footpath that runs through this open space now is where I begin most of my runs. I'll be just another victim of progress it seems, albeit super-rad progress.
  1. Construction of the proposed Sarah Williams Trail along the Canada Ancha and lower Hyde Park Rd, connecting the Dale Ball Trails at Sierra del Norte to Gonzales Rd, and a eventual connection to the planned (now completed) Gonzales Rd Pedestrian Trail stretching down to Alameda St. and the Santa Fe River Trail.
  1. Additional and improved bike lane striping on city streets, including the widening of shoulders in some locations. If you do a lot of commuting and getting around by bike - like myself and a growing group of other bikeys around town - this is important work that will get its fair share of use. 

santa fe botanical garden
 - Further details of the bond funded trail improvements can be found at the Trail Improvements Tab (above).
 - Additional info here at the City of Santa Fe website
 - A bit about the new St. Francis underpass and Gail Ryba Trail extension from  the Santa Fe New Mexican.
 - A bit about the new connector trail to Museum Hill and the Santa Fe Botanical Gardens from the Santa Fe New Mexican (left).



Related Posts:
 - Multi Use Trails Update (2014)
 - Arroyo Chamiso Underpass
 - Acequia Trail Underpass




View Acequia Trail - Santa Fe, NM in a larger map


LinkWithin

Related Posts Plugin for WordPress, Blogger...